Well, I've sold my AF2. Entropy retired to a happy home in sunny Arizona. Pays for the outboard on the CLC. Interestingly enough the buyer, according to his friend (who we delivered the boat too), has an occupation of “rich kid”. I think it’s neat that he could afford any boat in the world, and wanted my homemade one!
Looking very much like a
boat.
The standard thing that people said
when I was building the AF2 was "how are you going to get it out the door?" The
standard thing people say about the CLC is "It looks like a boat". As you can
see from the pictures below, it does look like a boat. Just not a
sailboat!
Windows, what to
do.
I finally decided to go with
Plexiglas/acrylic instead of Lexan/polycarbonate. Decided to do my own tinting
instead of paying the extra for the tinted acrylic, not sure I saved any money,
and in the long run may need to redo all the windows. However, they would be
easy to switch out, in that event.
Battery
adventures
Well, the money I saved by going
with the Sam's Club golf cart batteries turned out to be not any money at all. I
have this bad habit of doing that, I’ll do something to save money, and wind up
spending more then if I had just gritted my teeth and did it right to start
with. Have to work on that.
When I was installing the batteries I noticed acid leaking from on of them when I moved it to the boat on the hand truck. Not good for a sailboat (even one that looks like a power boat) that the batteries would leaks when tilted. Decided to get the West Marine version of the golf cart batteries, even though they cost twice as much as the Sam’s batteries, on the theory they wouldn't leak. Two weeks after I placed the order, West Marine still didn't have them. Canceled, and paid twice as much again, for MK gel sell batteries with the golf card form factor.
Then, when they came, one of them
had a smashed in center cell. With some encouragement
http://www.westcobattery.com/ sent a replacement. When it arrived, it was three!
I originally had complained because a couple of the bolts were missing.
Apparently they sent two new batteries then. Then when I convinced them the cell
was smashed too much, they sent a replacement for that. Swapped out the bad one
and sent the three back. (on their dime)
The Westco Battery guy said “they
probably double stacked them”. Right on the side of the box it said DO NOT
DOUBLE STACK. (not really a box, more a cardboard half cover for the batteries)
Interestingly, the shipping guy was
having a cow that I would claim the batteries were damaged. I told him it was
between him and WestCo. He put the three batteries on the hand truck to haul
them up the driveway, and guess what, only two would fit. So, he stacks the third one on top. Is
that “double stacking?”
I remember a conversation with a guy
who had built a very pretty wood and epoxy boat about the size of the Chebacco.
He said he had used 10 gallons of epoxy and I remember asking "why so much?" I
hope Larry at Raka likes me; I stopped counting at 30
gallons...
mast,
titebond
![]() |
![]() |
![]() |
Here are some pictures of the mast. On the left I'm using pallet wrap to pull some of the wrinkles out around the transition from square to round. Primitive vacuum bagging, without the vacuum or the bag.
![]() |
![]() |
![]() |
Left hand picture here we are clamping the spacer boards on the mast, Made the mast hollow so the wires for the anchor light would have a place to run. Right show the sanding crew hard at work.
![]() |
![]() |
Nice picture of the scarphs for the mast. Bottom of the mast is doug fir, top is red cedar.
Decided I would laminate the other
spars with TiteBond II instead of epoxy, save money, and it’s still stronger
than the wood. Need lots of clamping pressure with TiteBond, every "C" clamp I
have is in this picture. Someone on Yahoo suggested there might be “creep”
problems using TiteBond. Don’t know about that, they aren’t under constant load.
Just have to wait and see what happens.
Going to redo the gaff hollow ala
birds mouth, gaff to plan is a bit heavier than I like. Also, decided the other
night to scarph up plywood scraps, so this should be an interesting stick. Then
again, I may save that for a latter project, and just use the stick as is for
now.
motor, mounting
board
Motor is in, rather heavier than I thought it would be, though it’s probably right to spec. Will worry about installing the alternator kit later. Actually, could have waited to buy the motor, can’t put the motor mounting board on yet ‘cuz it would block easy access for getting into the boat. Made the mounting board out of sheathed plywood instead of oak, will put a 1/4" aluminum plate for wear resistance. Also, I'm putting wedges under the mounting board on the back of the boat, instead of making mounting brackets ala plans inside the motor well.
Camper Works
Sad to say I had (and am still
having) a bad experience buying something online. I bought a porta potti from a place called
“Camper Works”. After 4 weeks it still hadn’t showed up. I started sending them
emails, which were ignored. I started calling them, and they kept giving
excuses. I finally got disgusted and canceled the order, and ordered from a
place called “Camper World”. The Thetford 135 from Camper World showed up in a
couple of days. Then, a couple of days later, the one from Camper Works showed
up! It had been shipped THREE DAYS after I called and canceled the order. I
shipped it back, and the guy said he would send a check….
Well, I haven’t gotten a check back.
I guess I’m going to have to call Discover Card and do a charge
back.
thriftymarine
Had a similar experience with
Thrifty Marine. They have such good prices on their Bomar hatches that I ordered
some more deck plates from them. A trivial order, $18, but I paid promptly and
expected the hatches to be shipped. 6 weeks later they hadn’t been, and emails
were not being responded to. Had to call, and kept getting excuses. “I’ll ship
them first thing in the morning”.
Finally had to send an email
threatening to report them to Paypal for fraud. This got my hatches sent, for
some reason. Owner said he would “make it up to me” on my next order. Needed
another 10” round hatch for the front, asked how much. He said he would ship it
gratis on Wednesday (neat, that would make up for the hassle!), but it’s been
three weeks…
I’ve added a warning on the “resources” page, buy from them at your own
risk.
Trim
![]() |
![]() |
![]() |
Splurged on the trim for boat,
figured if I spent this much time and money on the boat, I would like some trim
that looked good. Bought about 12 board feet of Honduras mahogany. Expensive
wood, almost as much as teak, could probably have got lots more red oak for the
same price. As it is, I’m going to get some mahogany stain and put it on, make
it look even redder.
![]() |
![]() |
Here are some picture of the seats going together. Note alcove and ventilation hole.
![]() |
![]() |
![]() |
Here are some pictures of the berths. I made access holes in the berth tops instead of having the whole top pull out ala plans. Stronger structurally, and looks better I think.
![]() |
![]() |
![]() |
![]() |
Some pictures of the tabernacle.
![]() |
![]() |
![]() |
Scraping paint runs, faster than sanding. Laying out cockpit coaming. Note that the only joints on the boat that are not stitch and glue are where I fastened something to a closed compartment and couldn't access the bottom. This requires a LOT of tape, but I have NO end grain or plywood edges exposed for water to get in.
![]() |
![]() |
![]() |
More pictures of the coaming going together, some pictures of the deck. To the right, picture of the sliding hatch on the forward deck. Also not to plans, plans showed a narrow hinging hatch.
The forward hatch will be sliding; the rest of the hatches will be hinged. Bought hatch hinges but they don’t work like I expected, and I think I’m going to sell them on Ebay and use treadmill belt and bungee cords for the hatch hinges.
![]() |
![]() |
![]() |
More sanding, and another picture of the forward hatch.
![]() |
![]() |
![]() |
Top hatch being "stich and glued" in with cleats and clamps. Note the profile of the deck on the right. Plans show a rounded curved deck. Decided that a stitch and glue hard chine deck would look better and go with the rest of the boat.
![]() |
![]() |
![]() |
Some pictures of the pilot house. Kind of looks like a tank or something, eh?
![]() |
![]() |
![]() |
More pictures of the pilot house.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Note the rag tied to the rope. Only took me about half a dozen times running into the rope to put the rag there. I guess I'm a slow learner.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
Redhead says it feels "creepy" inside the pilothouse. No windows yet.
![]() |
![]() |
![]() |
Side decks give plenty of room for walking. Starting to work on the icebox. Laying out the panels for marking.
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
More icebox work, center picture is the compartment for the potti.
![]() |
![]() |
![]() |
Icebox going in. Offset top so cabin/cockpit bulkhead won't span the lid. Right I'm foaming the extra spaces out.
![]() |
![]() |
![]() |
Board holding down the styrofoam, expanding foam, well, expands, so it was trying push the rest of the styrofoam up. Stuck the pieces together with 3M spray adhesive.
![]() |
![]() |
My experiments into vacuum bagging. Bagging the aft mast step to make sure the glass sticks down to the wood on all the odd corners. Without bagging I would have hat to do it in several stages, and do a lot of sanding. With bagging I can do it all at once, and only need to scrap off the creases left from the bag.
-Chebacco
Richard